Wednesday, November 25, 2026

Drill results · Financings · Deals · Every release, every hour

Loading live prices…

Market data by TradingView

Home

News release

Talisker Intersects 214.21 g/t Au over 1.00 m within 84.53 g/t Au over 2.60 metres in the Mustang Zone - 2026 Bralorne Gold Project Drilling Program - $TSK.TO $TSKFF.US $TSK-WT.TO

Read the release on CEO.CA

Discuss on$TSK.TO

Loading live prices…

Market data by TradingView

TORONTO, Nov. 25, 2026 (GLOBE NEWSWIRE) -- Talisker Resources Ltd. (“Talisker” or the “Company”) (TSX:TSK | OTCQX:TSKFF) is pleased to announce results from an additional 29 drill holes from the Mustang Zone - 2026 Bralorne Gold Project resource delineation and conversion drilling program, following the previously reported first 92 drill holes, at its currently producing Mustang Mine.

Highlights from the additional 29 drill holes include:

  • SB-2026-052 - 214.21 g/t Au over 1.00 m within 84.53 g/t Au over 2.60 m on the Alhambra Vein
  • SB-2026-049 - 149.42 g/t Au over 0.60 m within 47.24 g/t Au over 2.10 m on the Alhambra Vein
  • UB-2026-049 - 120.95 g/t Au over 0.55 m within 28.45 g/t Au over 2.45 m on the Alhambra Vein
  • UB-2026-061 - 115.31 g/t Au over 0.60 m within 41.66 g/t Au over 2.10 m on the Alhambra Vein
  • UB-2026-061 - 113.19 g/t Au over 0.90 m within 43.82 g/t Au over 2.40 m on the BK Vein

Up to and including data in this news release, the total drilling at the Mustang Mine (including both Bralorne West and Mustang zones) in 2026 is 30,854 m in 121 drill holes. The 2026 drill program is predominantly focused on infill and delineation drilling of the Alhambra, BK, and BK-9870 veins and Bralorne West’s 101, 55 HW, 276, and 55 veins, all within the Mustang Mine.

The Mustang zone continues to deliver strong gold intercepts across multiple levels of the deposit, further enhancing confidence in the continuity and predictability of mineralization.

Terry Harbort, CEO of Talisker commented, “The strong grades returned from drilling on multiple levels within the Mustang Zone are particularly encouraging. Beyond confirming the continuity of mineralization, this work is providing valuable detail for mine planning and helping to position the Mustang zone as a key component of our future growth strategy at Bralorne.”

All drill holes in this release are located in the Mustang Mine and hosted in diorite. Major vein structures intersected are orogenic quartz-carbonate veins with banded sulfide septae. Crack-seal septae host fine-grained arsenopyrite and pyrite mineralization. Alteration halos consist of strong silica – sericite ± mariposite alteration with disseminated sulfides.

Bralorne Gold Project - 2026 Diamond Drilling Top Intercepts Table
Drill Hole NameFrom
(m)
To
(m)
Interval
(m)
Au
(g/t)
Interpreted
Structure
SB-2026-031A282.00282.500.5010.30Vein Halo
SB-2026-031A282.50283.250.759.25Vein Halo
SB-2026-031A283.25283.800.555.49Untargeted Vein
SB-2026-031A283.80284.350.550.03Vein Halo
SB-2026-044131.40132.000.600.40Vein Halo
SB-2026-044132.00132.650.650.05Vein Halo
SB-2026-044132.65133.200.550.36Vein Halo
SB-2026-044133.20134.000.804.04Alhambra Vein
SB-2026-045113.70114.600.900.01Vein Halo
SB-2026-045114.60115.100.501.47Alhambra Vein
SB-2026-045115.10115.800.705.56Alhambra Vein
SB-2026-046116.40116.900.500.44Vein Halo
SB-2026-046116.90117.400.508.35Alhambra Splay Vein
SB-2026-046117.40118.000.600.99Vein Halo
SB-2026-04773.1073.700.609.57Untargeted Vein
SB-2026-04773.7074.200.500.47Vein Halo
SB-2026-04774.2075.251.050.03Vein Halo
SB-2026-04857.0057.850.850.01Vein Halo
SB-2026-04857.8558.350.500.24Vein Halo
SB-2026-04858.3559.150.806.31BK Vein
SB-2026-048147.10148.000.908.18Alhambra Vein
SB-2026-048148.00149.051.051.94Alhambra Vein
SB-2026-048149.05149.900.851.01Vein Halo
SB-2026-048149.90150.850.9516.16Alhambra Splay
SB-2026-04959.3059.900.600.22Vein Halo
SB-2026-04959.9060.600.7014.05BK Vein
SB-2026-04960.6061.100.505.13Vein Halo
SB-2026-04961.1061.600.500.03Vein Halo
SB-2026-04984.9085.450.550.47Vein Halo
SB-2026-04985.4586.350.9011.09Untargeted Vein
SB-2026-04986.3587.000.650.11Vein Halo
SB-2026-049162.00162.500.500.43Vein Halo
SB-2026-049162.50163.000.501.29Vein Halo
SB-2026-049163.00163.500.5010.07Untargeted Vein Halo
SB-2026-049163.50164.000.501.26Vein Halo
SB-2026-049169.40169.900.503.02Vein Halo
SB-2026-049169.90170.400.5013.87Alhambra Vein
SB-2026-049170.40171.000.60149.42Alhambra Vein
SB-2026-049171.00171.500.502.21Vein Halo
SB-2026-050
94.0094.700.700.05Vein Halo
SB-2026-050
94.7095.250.550.22Vein Halo
SB-2026-050
95.2595.750.504.52Alhambra Vein
SB-2026-050
95.7596.300.551.38Vein Halo
SB-2026-05125.0025.550.556.66BK-9870 Vein
SB-2026-05125.5526.250.702.56Vein Halo
SB-2026-05126.2527.000.750.55Vein Halo
SB-2026-05255.1056.101.000.01Vein Halo
SB-2026-05256.1056.600.501.75Vein Halo
SB-2026-05256.6057.100.505.57Untargeted Vein
SB-2026-052103.40104.401.00214.21Alhambra Vein
SB-2026-052104.40105.000.600.71Vein Halo
SB-2026-052105.00105.500.501.73Vein Halo
SB-2026-052105.50106.000.508.56Alhambra Vein
UB-2026-04781.5082.100.603.78Vein Halo
UB-2026-04782.1082.700.603.76Vein Halo
UB-2026-04782.7083.300.6020.90BK Vein
UB-2026-04783.3083.850.552.11Vein Halo
UB-2026-04951.0051.600.600.27Vein Halo
UB-2026-04951.6052.250.650.48Vein Halo
UB-2026-04952.2552.800.55120.95Alhambra Vein
UB-2026-04952.8053.450.654.16Alhambra Vein
UB-2026-04992.6093.150.550.96Vein Halo
UB-2026-04993.1594.000.858.61BK Vein
UB-2026-04994.0094.600.600.61Vein Halo
UB-2026-049116.45116.950.503.10Vein Halo
UB-2026-049116.95117.450.503.11Untargeted Vein
UB-2026-049117.45117.950.504.09Untargeted Vein
UB-2026-049117.95118.550.6011.41Untargeted Vein
UB-2026-049238.15238.700.5536.74Untargeted Vein
UB-2026-049238.70239.500.800.90Vein Halo
UB-2026-049239.50240.000.508.41Vein Halo
UB-2026-049240.00240.750.750.14Vein Halo
UB-2026-051209.60210.200.600.06Vein Halo
UB-2026-051210.20211.150.951.73Vein Halo
UB-2026-051211.15212.000.8526.89Untargeted Vein
UB-2026-051220.50221.400.900.01Vein Halo
UB-2026-051221.40222.000.609.92Untargeted Vein
UB-2026-051222.00222.900.900.20Vein Halo
UB-2026-051269.00270.001.005.19Vein Halo
UB-2026-051270.00270.750.750.03Vein Halo
UB-2026-051270.75271.600.8518.66Untargeted Vein
UB-2026-051328.35328.950.600.71Vein Halo
UB-2026-051328.95329.550.608.39King Vein
UB-2026-051329.55330.050.501.62King Vein
UB-2026-051330.05331.000.950.53Vein Halo
UB-2026-05346.4547.150.700.04Vein Halo
UB-2026-05347.1547.650.509.78Alhambra Vein
UB-2026-05347.6548.200.556.11Alhambra Vein
UB-2026-05348.2048.750.553.03Vein Halo
UB-2026-05380.5081.000.504.09Vein Halo
UB-2026-05381.0081.750.751.91BK Vein
UB-2026-05381.7582.300.553.17BK Vein
UB-2026-05382.3082.900.606.30BK Vein
UB-2026-053266.10266.650.558.25King Vein
UB-2026-053266.65267.250.6011.12King Vein
UB-2026-053267.25267.750.500.71King Vein
UB-2026-053267.75268.250.500.09Vein Halo
UB-2026-05648.3549.100.759.23Alhambra Vein
UB-2026-05649.1050.101.003.56Alhambra Vein
UB-2026-05650.1050.650.554.22Alhambra Vein
UB-2026-05650.6551.150.503.61Vein Halo
UB-2026-05651.1551.700.556.53Vein Halo
UB-2026-05651.7052.550.857.35Vein Halo
UB-2026-05688.2088.800.606.76Untargeted Vein
UB-2026-05688.8089.450.651.11Untargeted Vein
UB-2026-05689.4589.950.501.44Untargeted Vein
UB-2026-05689.9590.450.504.17Untargeted Vein
UB-2026-056155.30155.900.600.33BK-9870 Vein
UB-2026-056155.90156.400.501.94BK-9870 Vein
UB-2026-056156.40157.050.658.69BK-9870 Vein
UB-2026-056157.05157.650.600.25Vein Halo
UB-2026-056285.45286.000.550.23Vein Halo
UB-2026-056286.00286.500.5032.28King Vein
UB-2026-056286.50287.000.500.27Vein Halo
UB-2026-056287.00287.550.550.01Vein Halo
UB-2026-05949.7050.701.000.01Vein Halo
UB-2026-05950.7051.350.650.71Vein Halo
UB-2026-05951.3552.000.655.08Alhambra Vein
UB-2026-05995.0095.600.607.04BK Vein
UB-2026-05995.6096.200.602.04BK Vein
UB-2026-05996.2096.950.757.75BK Vein
UB-2026-05996.9597.500.556.24Vein Halo
UB-2026-059163.40164.000.601.07BK-9870 Splay
UB-2026-059164.00165.151.155.82BK-9870 Splay
UB-2026-059165.15165.650.501.55BK-9870 Splay
UB-2026-059174.30175.100.8022.96M1 Vein
UB-2026-059175.10175.950.851.42M1 Vein
UB-2026-059175.95176.800.852.21M1 Vein
UB-2026-059288.40289.000.600.88Vein Halo
UB-2026-059289.00289.900.901.41Vein Halo
UB-2026-059289.90290.550.6512.40King Vein
UB-2026-06160.7561.250.500.43Vein Halo
UB-2026-06161.2561.850.60115.31Alhambra Vein
UB-2026-06161.8562.350.502.12Alhambra Vein
UB-2026-06162.3562.850.5034.06Alhambra Vein
UB-2026-061106.60107.100.500.07Vein Halo
UB-2026-061107.10107.600.504.01BK Vein
UB-2026-061107.60108.500.90113.19BK Vein
UB-2026-061108.50109.000.502.52Vein Halo
UB-2026-06481.6082.601.000.01Vein Halo
UB-2026-06482.6083.100.500.02Vein Halo
UB-2026-06483.1083.650.559.73Alhambra Vein
UB-2026-064122.50123.501.000.20Vein Halo
UB-2026-064123.50124.000.504.19Vein Halo
UB-2026-064124.00124.550.557.31Untargeted Vein
UB-2026-066No Significant intercept
UB-2026-06796.9097.650.752.10Vein Halo
UB-2026-06797.6598.250.601.80Vein Halo
UB-2026-06798.2599.050.805.20BK Vein
UB-2026-069
89.5090.000.500.81Vein Halo
UB-2026-069
90.0090.500.502.22Vein Halo
UB-2026-069
90.5091.000.501.02Vein Halo
UB-2026-069
91.0091.750.752.01Alhambra Vein
UB-2026-07079.5580.100.551.94Vein Halo
UB-2026-07080.1080.600.501.21Vein Halo
UB-2026-07080.6081.100.500.10Vein Halo
UB-2026-07081.1081.650.5510.90Alhambra Vein
UB-2026-07174.3575.000.652.23Alhambra Splay
UB-2026-07175.0075.800.801.07Alhambra Splay
UB-2026-07175.8076.300.501.66Vein Halo
UB-2026-07176.3076.900.600.18Vein Halo
UB-2026-073No Significant intercept
UB-2026-07484.6085.150.550.20Vein Halo
UB-2026-07485.1585.750.603.74BK Vein
UB-2026-07485.7586.250.505.66BK Vein
UB-2026-07486.2586.850.601.08Vein Halo
UB-2026-076115.70116.350.657.99Untargeted Vein
UB-2026-076116.35116.900.550.94Untargeted Vein
UB-2026-076116.90118.001.105.96Untargeted Vein
UB-2026-077112.55113.050.5012.78BK Vein
UB-2026-077113.05113.550.506.81Vein Halo
UB-2026-077113.55114.100.555.07Vein Halo
UB-2026-077114.10114.600.500.50Vein Halo
UB-2026-079110.65111.150.506.11Vein Halo
UB-2026-079111.15111.750.608.54BK Vein
UB-2026-079111.75112.350.606.43BK Vein
UB-2026-079112.35112.950.607.43BK Vein
UB-2026-079112.95113.600.652.25BK Vein
UB-2026-079113.60114.200.608.27BK Vein
UB-2026-081
No Significant intercept (Subvertical Infrastructure Drain Hole)
Note: The bolded assay samples in this table have been used for the composite assay values and intervals reported in the Highlights section. True thickness of structures in this release range from 26 to 95% of the apparent thicknesses.
Bralorne Gold Project - Drill Collar Locations Table (values rounded to nearest metre)
Drill Hole NameUTM EastingUTM NorthingElevation (m)
SB-2026-031A51360456252851263
SB-2026-04451321856254531220
SB-2026-04551321956254531220
SB-2026-04651321856254531220
SB-2026-04751321856254531220
SB-2026-04851321756254531220
SB-2026-04951321756254531221
SB-2026-05051322856254351221
SB-2026-05151322656254351221
SB-2026-05251322556254341221
UB-2026-04751330756253861039
UB-2026-04951330856253871039
UB-2026-05151330656253861039
UB-2026-05351330856253861039
UB-2026-05651330756253861039
UB-2026-05951330756253861040
UB-2026-06151330656253861039
UB-2026-06451330656253861039
UB-2026-06651330156253851040
UB-2026-06751330956253871038
UB-2026-06951330956253871038
UB-2026-07051330856253871038
UB-2026-07151330856253871038
UB-2026-07351330856253871039
UB-2026-07451330756253861038
UB-2026-07651330656253861038
UB-2026-07751330556253861038
UB-2026-07951331056253871038
UB-2026-08151330656253821038
Bralorne Gold Project - Drill Collar Orientations Table
(negative dip points down from the horizontal)
Drill Hole NameAzimuth (°)Dip (°)Total Depth (m)
SB-2026-031A15.00-58.00327.00
SB-2026-044199.00-53.50150.00
SB-2026-045173.00-50.00132.00
SB-2026-046186.00-49.00135.00
SB-2026-047197.00-47.00141.00
SB-2026-048209.00-49.00162.00
SB-2026-049216.00-45.00189.00
SB-2026-050175.00-50.00114.00
SB-2026-051194.00-46.50114.00
SB-2026-052207.00-45.00126.00
UB-2026-047337.00-8.50186.00
UB-2026-049315.505.00270.30
UB-2026-051310.000.50450.00
UB-2026-053332.000.00300.00
UB-2026-056326.50-1.00306.00
UB-2026-059318.5017.75327.00
UB-2026-061304.503.00354.00
UB-2026-064285.002.50297.00
UB-2026-066278.009.50168.00
UB-2026-06734.90-30.00126.00
UB-2026-06920.00-35.00132.00
UB-2026-0704.90-38.00114.00
UB-2026-0710.00-30.00120.00
UB-2026-073348.00-21.00102.00
UB-2026-074330.90-27.00111.00
UB-2026-076327.00-40.00132.00
UB-2026-077311.00-24.00130.5
UB-2026-07945.00-27.00135.00
UB-2026-081247.00-74.5061.00
    

For further information, please contact:

Lindsay Dunlop
Vice President, Investor Relations
lindsay.dunlop@taliskerresources.com
+1 647 274 8975

Qualified Person

The scientific and technical information contained in this news release has been reviewed and approved by Kyle Orr, P.Geo., Vice President, Exploration of Talisker, who is a “Qualified Person” as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects. Mr. Orr is not independent of the Company for the purposes of NI 43-101.

About Talisker Resources Ltd.

Talisker (taliskerresources.com) is a junior resource company involved in the exploration and development of gold projects in British Columbia, Canada. Talisker’s flagship asset is the high-grade, fully permitted Bralorne Gold Project where the Company is producing at the Mustang Mine. Talisker projects also include the Ladner Gold Project, an historic high-grade gold mine near Hope, British Columbia, with significant exploration potential, and the Spences Bridge Project, where the Company has a significant landholding in the emerging Spences Bridge Gold Belt, as well as several other early-stage Greenfields projects.

Sample Preparation and QAQC 

Drill core in this new release from the Bralorne Gold Project was drilled in NQ size (47.6mm) or HQ size (63.5mm) diameters. Drill core samples are a minimum of 50 cm and a maximum of 150 cm long along the core axis. Samples are focused on an interval of interest, such as a vein or zone of mineralization. Shoulder samples bracket the interval of interest such that a total sampled core length of not less than 3m both above and below the interval of interest must be assigned. Sample QAQC measures of unmarked certified reference materials (CRMs), blanks, and duplicates are inserted into the sample sequence and makeup 10% of the samples submitted to the lab for holes reported in this release. Actlabs performed sample preparation and analyses in Kamloops, British Columbia. Drill core sample preparation includes drying in an oven, crushing of the sample up to 80% passing 2 mm, sample splitting using a riffle splitter, and pulverizing a 1,000 g split to 95% passing 105 microns (ACT code RX1+1000). Gold in diamond drill core is analyzed by fire assay and atomic absorption spectroscopy (AAS) of a 50g sample (ACT code 1A2-50-ORE). Gold assay technique 1A2-50-ORE has an upper detection limit of 100 ppm. Any sample that produces an over-limit gold value via the gold assay technique is sent for gravimetric finish (ACT method 1A3-50) which has an upper detection limit of 10,000 ppm Au. Beginning in August 2026, the primary analytical laboratory was changed from Actlabs to Paragon Geochemical, and gold analyses were transitioned from conventional fire assay methods to PhotonAssay™ methodology. At Paragon Geochemical, drill core samples were prepared by drying at 100°C, crushing, splitting, and jarring. Samples were crushed to 70% passing 2 mm (PA-PREP) and riffle split to produce a 500 g subsample. Gold analyses were completed on the 500 g jar using the two-cycle PhotonAssay™ method (PA-AU01), which has a reported detection range of approximately 0.015 to 350 ppm Au. Samples returning results above the upper analytical limit were assigned an over-range (OVR) flag and re-analyzed using the high-range PhotonAssay™ method (PAAU02H), which extends the upper analytical limit to 3,500 ppm Au. Samples that remained over-range were subsequently analyzed using the extra high-range PhotonAssay™ method (PAAU02HH), extending the upper analytical limit to 10,000 ppm Au. Where asymmetrically distributed native gold mineralization is observed by the core logging geologist, a “cut-line” may be drawn along the length of the core to guide the core cutter to evenly bisect that mineralization thereby helping to ensure a representative sample. Where no sample cut line is drawn by the geologist the standard procedure is to preserve the oriented core “backside line” or “bottom of hole” mark in the core box. Duplicates were sampled by taking a ¼ core primary sample and a ¼ core as the duplicate sample, thereby leaving a ½ core representative sample in the box. A photo archive exists for all core from before sampling.

Caution Regarding Forward Looking Statements

Certain statements contained in this press release constitute forward-looking information. The use of any of the words “could”, “intend”, “expect”, “believe”, “will”, “projected”, “estimated” and similar expressions and statements relating to matters that are not historical facts are intended to identify forward-looking information and are based on Talisker’s current belief or assumptions as to the outcome and timing of such future events. Various assumptions or factors are typically applied in drawing conclusions or making the forecasts or projections set out in forward-looking information. Those assumptions and factors are based on information currently available to Talisker. Although such statements are based on reasonable assumptions of Talisker’s management, there can be no assurance that any conclusions or forecasts will prove to be accurate.

Forward looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include risks inherent in the exploration and development of mineral deposits, including risks relating to changes in project parameters as plans continue to be redefined, risks relating to variations in grade or recovery rates, risks relating to changes in mineral prices and the worldwide demand for and supply of minerals, risks related to increased competition and current global financial conditions, access and supply risks, reliance on key personnel, operational risks, regulatory risks, including risks relating to the acquisition of the necessary licenses and permits, financing, capitalization and liquidity risks, title and environmental risks and risks relating to the failure to receive all requisite shareholder and regulatory approvals.

The forward-looking information contained in this release is made as of the date hereof, and Talisker is not obligated to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by applicable securities laws. Because of the risks, uncertainties and assumptions contained herein, investors should not place undue reliance on forward-looking information. The foregoing statements expressly qualify any forward-looking information contained herein.

A Media Snippet accompanying this announcement is available by clicking on this link.


See the discussion and this release on CEO.CA

This news release was issued by the company and distributed by GlobeNewswire. It first appeared on CEO.CA.

Nothing on Junior Gold Stocks is investment advice. Statements in a news release, including any technical or forward-looking information, are the issuer's own.